Nebraska Ready-Mix Concrete Prices 2026: Cost Per Cubic Yard

Per cubic yard cost ranges across Nebraska's major metros, plus seasonality, code requirements, and supplier directories.

Updated July 2026Real local pricing via FRED PPI + state adjustmentsIncludes recommended waste factorsmethodology ↗
Direct Answer
Prices updated August 2026

In Nebraska, concrete averages $155.10 per cubic yard as of 2026, with metro pricing ranging from $148.90 to $159.75 per cubic yard. Nebraska pricing runs about 6% below the national midpoint of $165.00 per cubic yard.

Material prices move fast. We recommend getting 2–3 local quotes before ordering.

How Much Does Concrete Cost in Nebraska?

Concrete averages $155.10 per cubic yard in Nebraska as of 2026 research, with metro-level pricing ranging from $148.90 (lowest-cost metro) to $159.75 (highest-cost metro). That's 6% below the national midpoint of $165.00 per cubic yard (source; confidence: high). The state midpoint is computed by applying Nebraska's 0.94× regional adjustment to the national-average dataset documented on our pricing methodology page.

Use the metro table below for finer-grained budgeting — within Nebraska, the spread between the cheapest and most expensive metro on the same material can run 15-30%.

What Drives Concrete Pricing in Nebraska?

Nebraska runs roughly 6% below the national midpoint on construction materials, reflecting a central Plains, agricultural economy and relatively low-to-moderate cost base. Abundant local sand and gravel from the Platte and Missouri river valleys helps keep aggregate and ready-mix inputs competitively priced, though panhandle and rural jobs can see higher delivery costs due to distance from plants.

Climate and supply factors: Nebraska builders design for deep frost, so footings typically run 36-42 in below grade depending on the county. Eastern Nebraska carries expansive clay soils and wind-blown loess that can shrink and swell with moisture, and freeze-thaw cycling stresses concrete flatwork and foundations statewide. Much of the state sits in Tornado Alley, so high-wind and storm-resistant detailing is a common design consideration.

Concrete Prices by Nebraska's Major Metros

Per-metro estimates apply each metro's population-weighted price tier to the Nebraska state midpoint. Population figures are 2024 ACS estimates from the U.S. Census Bureau.

MetroPopulationPer Cubic yardvs. State Avg
Omaha487K$159.75+3%
Lincoln292K$158.20+2%
Bellevue64K$156.65+1%
Grand Island53K$150.45-3%
Kearney34K$148.90-4%

When to Buy Concrete in Nebraska

Construction season in Nebraska: April through November is the practical building window across Nebraska, with the busiest stretch from late spring into fall. Deep frost and freeze-thaw make winter footing and flatwork work slower and costlier, and cold-weather concrete placement requires protection (blankets, heated enclosures) once ground and air temperatures drop, so many projects target the frost-free months.

Ready-mix pricing peaks in May-July when residential and commercial demand stack; cold-weather pours add curing-protection cost in northern states. For non-emergency work in Nebraska, ordering during the off-peak window typically saves 5-15% vs. spring/summer peak pricing. Material yards run promotional pricing twice a year — early-spring (Mar-Apr) on bagged products and late-fall (Oct-Nov) on bulk aggregates as plants clear inventory before shutdown.

Climate & Code Considerations for Concrete in Nebraska

Frost line: 36-42 in (set by local amendment to the Nebraska Residential Code / IRC Table R301.2(1); ~36 in is common across eastern Nebraska including the Omaha area, deepening toward ~42 in in the north and panhandle). Nebraska's frost line drives footings and bases below the frost depth, adding 25-50% more concrete (or aggregate base) to perimeter foundations vs. southern states with no frost requirement.

State / local code: Nebraska has a State Building Code (Neb. Rev. Stat. 71-6403 et seq.) that adopts editions of the International Building Code and International Residential Code, but adoption and enforcement are largely local. Individual cities, villages, and counties decide whether to adopt and enforce a building code; those that do must use codes conforming generally to the state code, while many smaller and rural jurisdictions do not actively enforce one. Always confirm which code edition and amendments the local building department applies before relying on any single statewide standard.

Where to Source Ready-Mix Concrete in Nebraska

Authoritative directories for sourcing ready-mix producers, aggregate quarries, and bagged-product retailers across Nebraska:

Get quotes from at least three local suppliers — pricing on the same spec varies 10-20% across producers in the same metro. Volume orders (10+ cu yd ready-mix, 20+ tons aggregate, full pallets bagged) typically earn another 5-10% off published quotes.

Calculate Concrete for Your Project

To budget accurately for your pour, calculate how many cubic yards you need, then apply Nebraska's 0.94× adjustment to the national-average cost displayed on the calculator. The calculator's built-in cost overlay uses national pricing — multiply the displayed total by 0.94 for a Nebraska-specific estimate, or use the per-metro figures in the table above for tighter budgeting.

Frequently Asked Questions

How much does concrete cost per cubic yard in Nebraska?

Concrete averages $155.10 per cubic yard in Nebraska, with a metro range of $148.90 to $159.75 as of 2026. Nebraska pricing runs about 6% below the national midpoint.

What is the cheapest Nebraska metro for concrete?

Kearney typically prices the lowest of the major Nebraska metros, around $148.90 per cubic yard. Omaha typically prices the highest, around $159.75. Differences come from delivery distance to producer plants and metro-area labor rates.

When is the best time of year to buy concrete in Nebraska?

April through November is the practical building window across Nebraska, with the busiest stretch from late spring into fall. Deep frost and freeze-thaw make winter footing and flatwork work slower and costlier, and cold-weather concrete placement requires protection (blankets, heated enclosures) once ground and air temperatures drop, so many projects target the frost-free months. Ready-mix pricing peaks in May-July when residential and commercial demand stack; cold-weather pours add curing-protection cost in northern states. For non-emergency work, ordering off-peak (late fall in cold-winter states, mid-winter in southern states) typically saves 5-15% vs. spring/summer peak pricing.

What code requirements affect concrete costs in Nebraska?

Nebraska has a State Building Code (Neb. Rev. Stat. 71-6403 et seq.) that adopts editions of the International Building Code and International Residential Code, but adoption and enforcement are largely local. Individual cities, villages, and counties decide whether to adopt and enforce a building code; those that do must use codes conforming generally to the state code, while many smaller and rural jurisdictions do not actively enforce one. Always confirm which code edition and amendments the local building department applies before relying on any single statewide standard.

Where can I find concrete suppliers in Nebraska?

Start with the Nebraska Concrete & Aggregates Association (NC&AA), the NRMCA national producer directory filtered to Nebraska, or the Quikrete dealer locator for bagged products. Get quotes from at least three local suppliers — pricing varies 10-20% across producers in the same metro.

Why is concrete more expensive in Nebraska than the national average?

Nebraska runs roughly 6% below the national midpoint on construction materials, reflecting a central Plains, agricultural economy and relatively low-to-moderate cost base. Abundant local sand and gravel from the Platte and Missouri river valleys helps keep aggregate and ready-mix inputs competitively priced, though panhandle and rural jobs can see higher delivery costs due to distance from plants.

Related Pages

Sources

National-average pricing triangulated from fred.stlouisfed.org. Updated Apr 2026 · methodology

Estimates only. Always verify with your supplier before ordering.

Written by Daniel McCarney — AceCalc