Concrete Prices in New Jersey 2026

Per cubic yard cost ranges across New Jersey's major metros, plus seasonality, code requirements, and supplier directories.

Direct Answer

In New Jersey, concrete averages $198.00 per cubic yard as of 2026, with metro pricing ranging from $188.10 to $217.80 per cubic yard. New Jersey pricing runs about 20% above the national midpoint of $165.00 per cubic yard.

How Much Does Concrete Cost in New Jersey?

Concrete averages $198.00 per cubic yard in New Jersey as of 2026 research, with metro-level pricing ranging from $188.10 (lowest-cost metro) to $217.80 (highest-cost metro). That's a 20% premium over the national midpoint of $165.00 per cubic yard (source; confidence: high). The state midpoint is computed by applying New Jersey's 1.20× regional adjustment to the national-average dataset documented on our pricing methodology page.

Use the metro table below for finer-grained budgeting — within New Jersey, the spread between the cheapest and most expensive metro on the same material can run 15-30%.

What Drives Concrete Pricing in New Jersey?

New Jersey pricing runs roughly 20% above the national midpoint. The state's mandatory 36-inch footing depth (vs. the 12-inch IRC default in southern states) drives meaningfully more concrete on every residential foundation, NYC-metro proximity inflates the northern counties, and the high density of competing ready-mix producers in central/southern NJ keeps pricing slightly below NY downstate.

Climate and supply factors: 36-inch minimum footing depth per NJ UCC (deeper than the IRC R403.1.4.1 default of 12 in for most southern states) drives 25-40% more concrete on perimeter footings. NYC-metro proximity inflates Bergen/Hudson/Essex county pricing toward NYC levels. Shore-zone CAFRA flood requirements add elevated-foundation costs in coastal communities.

Concrete Prices by New Jersey's Major Metros

Per-metro estimates apply each metro's population-weighted price tier to the New Jersey state midpoint. Population figures are 2024 ACS estimates from the U.S. Census Bureau.

MetroPopulationPer Cubic yardvs. State Avg
Newark311K$207.90+5%
Jersey City292K$217.80+10%
Paterson159K$198.00
Trenton90K$188.10-5%
Atlantic City39K$198.00

When to Buy Concrete in New Jersey

Construction season in New Jersey: April-November typical; cold-weather concreting Nov-Mar adds curing protection cost. Shore communities see late-spring demand spikes pre-Memorial Day.

Ready-mix pricing peaks in May-July when residential and commercial demand stack; cold-weather pours add curing-protection cost in northern states. For non-emergency work in New Jersey, ordering during the off-peak window typically saves 5-15% vs. spring/summer peak pricing. Material yards run promotional pricing twice a year — early-spring (Mar-Apr) on bagged products and late-fall (Oct-Nov) on bulk aggregates as plants clear inventory before shutdown.

Climate & Code Considerations for Concrete in New Jersey

Frost line: 30-36 in (per NJ UCC subcode, with 36 in standard for footings). New Jersey's frost line drives footings and bases below the frost depth, adding 25-50% more concrete (or aggregate base) to perimeter foundations vs. southern states with no frost requirement.

State / local code: New Jersey Uniform Construction Code (UCC) — adopted IRC/IBC with NJ-specific subcodes including a 36-inch minimum footing depth statewide (N.J.A.C. 5:23). Coastal A-zone and V-zone flood requirements per FEMA + NJ DEP CAFRA add cost on shore properties. Deeper required footing depth (vs. southern-state minimums) means meaningfully more concrete on every residential foundation.

Where to Find Concrete Suppliers in New Jersey

Authoritative directories for sourcing ready-mix producers, aggregate quarries, and bagged-product retailers across New Jersey:

Get quotes from at least three local suppliers — pricing on the same spec varies 10-20% across producers in the same metro. Volume orders (10+ cu yd ready-mix, 20+ tons aggregate, full pallets bagged) typically earn another 5-10% off published quotes.

Calculate Concrete for Your Project

Use our Concrete Calculator to estimate quantity, then apply New Jersey's 1.20× adjustment to the national-average cost displayed on the calculator. The calculator's built-in cost overlay uses national pricing — multiply the displayed total by 1.20 for a New Jersey-specific estimate, or use the per-metro figures in the table above for tighter budgeting.

Frequently Asked Questions

How much does concrete cost per cubic yard in New Jersey?

Concrete averages $198.00 per cubic yard in New Jersey, with a metro range of $188.10 to $217.80 as of 2026. New Jersey pricing runs about 20% above the national midpoint.

What is the cheapest New Jersey metro for concrete?

Trenton typically prices the lowest of the major New Jersey metros, around $188.10 per cubic yard. Jersey City typically prices the highest, around $217.80. Differences come from delivery distance to producer plants and metro-area labor rates.

When is the best time of year to buy concrete in New Jersey?

April-November typical; cold-weather concreting Nov-Mar adds curing protection cost. Shore communities see late-spring demand spikes pre-Memorial Day. Ready-mix pricing peaks in May-July when residential and commercial demand stack; cold-weather pours add curing-protection cost in northern states. For non-emergency work, ordering off-peak (late fall in cold-winter states, mid-winter in southern states) typically saves 5-15% vs. spring/summer peak pricing.

What code requirements affect concrete costs in New Jersey?

New Jersey Uniform Construction Code (UCC) — adopted IRC/IBC with NJ-specific subcodes including a 36-inch minimum footing depth statewide (N.J.A.C. 5:23). Coastal A-zone and V-zone flood requirements per FEMA + NJ DEP CAFRA add cost on shore properties. Deeper required footing depth (vs. southern-state minimums) means meaningfully more concrete on every residential foundation.

Where can I find concrete suppliers in New Jersey?

Start with the New Jersey Concrete & Aggregate Association (NJCAA) member directory, the NRMCA national producer directory filtered to New Jersey, or the Quikrete dealer locator for bagged products. Get quotes from at least three local suppliers — pricing varies 10-20% across producers in the same metro.

Why is concrete more expensive in New Jersey than the national average?

New Jersey pricing runs roughly 20% above the national midpoint. The state's mandatory 36-inch footing depth (vs. the 12-inch IRC default in southern states) drives meaningfully more concrete on every residential foundation, NYC-metro proximity inflates the northern counties, and the high density of competing ready-mix producers in central/southern NJ keeps pricing slightly below NY downstate.